Portfolio

K-12

Ridgeview Classical Schools
A design/build remodel which transformed an existing outdated child care facility into a high school expansion for a growing charter school. Project included new branch circuits for existing lighting, general purpose power, also including revised special systems of fire alarm, and A/V systems.

Location: Fort Collins, CO

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: SRB Consulting Engineering


Mapleton Skyview Campus and Clayton Partnership School
A $1.4 million LEED Gold design-build of a 74,000 square foot K-12 educational campus included a new 1600 amp service, power distribution, energy efficient lighting and n-Light lighting controls, electrical connections to owner furnished equipment, also including fire alarm, communications, security, access control, clock system, and paging system.

Location: Denver, CO

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: SRB Consulting Engineering


Mapleton Expeditionary School of the Arts and Mapleton Early College
A $1.7 million LEED Gold design-build of an 82,450 square foot K-12 college preparation and arts campus included a new 1600 amp service, power distribution, energy efficient lighting and n-Light lighting controls, electrical connections to owner furnished equipment, also including fire alarm, communications, security, access control, clock system, and paging system.

Location: Denver, CO

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: SRB Consulting Engineering


Mapleton North Valley Young Adults Learning Center
The new $1.2 million LEED Gold design-build addition included a new 20,000 square foot building with classrooms, and a library with state-of-the-art lighting and N-light lighting controls. The Renovation included a lighting upgrade of classrooms, locker rooms, administration areas and corridors with new energy efficient fixtures and n-Light lighting controls, and an upgrade of the fire alarm system with a new fire alarm control panel with new fire alarm devices throughout.

Location: Denver, CO

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: SRB Consulting Engineering


Liberty Commons High School – Addition
A 12,000 square foot addition to the existing Liberty Common High School. Added general purpose power, lighting, fire alarm, and special systems to a new classroom wing on two floors with a new cafeteria and commons area on first floor. All Classrooms were set up with WIFI, projectors with HDMI, and new whiteboards for interactive learning.

Location: Fort Collins, CO

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: SRB Consulting Engineering


Platte Valley Schools
A $400k Design/Build remodel project for the Elementary, Middle, and High School with a new 8,000 sq. ft. Bus Maintenance Building.

Location: Kersey, CO

General Contractor: Milender White Construction

Architect: RB+B Architects

Engineer: SRB Consulting Engineering


Miami Yoder School
A $1.2M Design/Build of a new 65,000 square foot High School addition, remodel of an existing Elementary, and Middle School with a new 1600 amp service.

Location: Rush, CO

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: Beaudin Ganze Consulting Engineers, Inc.


Imagine School – Indigo Ranch
This 48,000 Sq. ft. K-8 charter school was designed to accommodate 750 students. The building includes sustainable features such as intergrated daylighting strategies in the classrooms and occupany sensors to optimize the efficiency of the buidling's energy systems. The 2-story main entry includes strong architectural features that serve as the focal point to the facility. The building includes a courtyard featuring an outdoor classroom and direct access from four of the kindergaren classrooms.

Location: Colorado Springs, CO

General Contractor: Hall-Irwin Construction

Architect: RB+B Architects

Engineer: Merit Electric


Imagine School – Firestone
This 48,000 Sq. ft. K-8 charter school was designed to accommodate 750 students.  The building includes sustainable features such as integrated day-lighting strategies in the classrooms and occupancy sensors to optimize the efficiency of the building's energy systems.  The 2-story main entry includes strong architectural features that serve as the focal point to the facility.  The building includes a courtyard featuring an outdoor classroom and direct access from four of the kindergarten classrooms.

Location: Firestone, CO

General Contractor: Hall-Irwin Construction

Architect: RB+B Architects

Engineer: SRB Consulting Engineering


Estes Park Middle School
Remodel with new electrical infrastructure of new laboratory areas, science, technology, computer, consumer, kitchen, cafeteria, family studies, and special needs area.

Location: Estes Park, CO

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: SRB Consulting Engineering



Knowledge Quest Academy
The features include an open lobby with elevator access to the upper level, a large flexible room for board meetings and other activities, and cantilevered shading devices over the windows. Unique also to this building are charter school facilities for the district.

Location: Milliken, CO

General Contractor: Hall-Irwin Construction

Architect: RB+B Architects

Engineer: Merit Electric


Briggsdale School Addition
A design build on an existing school remodel including classrooms, cafeteria, and a new expansion combining for 40,000 square foot.

Location: Briggsdale, CO

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: SRB Consulting Engineering


Weldon Valley School
This is the first phase of a three-phase process, which included the new junior and senior high wing. Phase two shall consist of a new elementary wing. Phase three shall consist the renovation of the historical portion of the school.

Location: Weldona, CO

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: SRB Consulting Engineering


Sterling High School
The $1.8M construction of Sterling High School includes major remodel of existing space, including expanded cafeteria, classrooms, administration and locker rooms with new service upgrade. Total square foot 177,556.

Location: Sterling, CO

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: SRB Consulting Engineering


Caliche Schools Grades 1-12
The construction of Caliche School includes service upgrade for added cooling system with minor remodel.

Location: Sterling, CO

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: SRB Consulting Engineering


Ayers Elementary
The construction of Ayres Elementary includes minor remodel of existing space with new classroom additions. Total square foot 9,300.

Location: Sterling, CO

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: SRB Consulting Engineering


Campbell Elementary
The construction of Campbell Elementary includes remodel of existing space with electrical service upgrade for new classroom addition, LMC, administration offices. New addition total square foot 23,200.

Location: Sterling, CO

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: SRB Consulting Engineering