BUILDING AUTOMATION SYSTEM CONTROLS
Larimer County Jail BAS (In Construction)
Location: Fort Collins, CO
Mechanical Contractor: Apollo Mechanical Contractors
Engineer: Trane Technologies
UCH Longs Peak (In Construction)
Location: Longmont, CO
Mechanical Contractor: US Engineering
Engineer: Siemens
St. Anthony’s North – Building Automation Controls
60,000 square foot addition included building automation systems controls and medical gas systems controls of physician clinic space; outpatient-treatment rooms, day surgery, women's delivery and baby-care rooms; a Level III trauma center with ER; and 92 inpatient beds and a Central Utility Plant.
Location: Westminster, CO
General Contractor: GE Johnson
Engineer: Siemens Building Technology
Boulder Community Hospital – Building Automation Controls
100,000 square foot addition and remodel in a working hospital. Adding 3 stories of patient wings and support rooms, MRI’s and operating rooms, a parking garage structure and cafeteria. Complete BAS install included a complete medical gas system monitoring system.
Location: Boulder, CO
General Contractor: Wyatt Construction
Engineer: Johnson Controls
Castlerock Adventist Hospital – Building Automation Controls
291,000 square foot building with BAS control of chilled water heat exchangers, monitoring of domestic hot water generators, heat exchangers, domestic hot water, heating water loops, air handling units, supply fans, return fans, mechanical room relief air dampers, air handling units. Controls for monitoring generator, general exhaust fans, monitoring of the Medical Gas Master alarm panels, radiant ceiling panel reheat, VAV boxes with reheat, and snowmelt system.
Location: Castlerock, CO
General Contractor: GE Johnson
Engineer: Johnson Controls
Children’s Hospital East Tower – Building Automation Controls
335,000 square foot building with BAS control of chilled water heat exchangers, monitoring of domestic hot water generators, steam to hot water heat exchangers, steam condensate heat recovery system to preheat domestic hot water, heating water loops, air handling units, supply fans, return fans, mechanical room relief air dampers, heat recovery system, LTOR air handling unit, pressurization room control for Bio-Molecular medicine. DDC Controls for pressurization room control for OR/Isolation/Bone Marrow transplant areas, controls for monitoring of steam generator, general exhaust fans, monitoring general alarm contacts at Medical Gas Master alarm panels, radiant ceiling panel reheat, VAV boxes with reheat, 2 pipe & 4 pipe fan coil units, and snowmelt system.
Location: Aurora, CO
General Contractor: Phipps/McCarthy
Engineer: Johnson Controls