Larimer County Behavioral Health (In Construction)

General Contractor: Haselden Construction

Architect: Page

Engineer: BCER

Cheyenne Regional Medical Center - West Campus (In Construction)

General Contractor: Saunders Heath Construction

Architect: Plan 1

Engineer: BSA

Medical

Orthopaedic and Spine Center of the Rockies

A 62,000 square foot addition to an existing facility includes a new 3000 amp power distribution service with a 1000kW emergency power service, LED lighting, lighting controls, general purpose power, owner equipment power connections, mechanical power connections, special systems rough-in, and voice evacuation fire alarm system.

General Contractor: GH Phipps

Architect: Infusion Architects, LLC

Engineer: BG Buildingworks

not-available.jpg

Loveland Veterans Administration Clinic (Under Construction)

A 20,000 square foot tenant improvement with new lighting, general power, HVAC power connections, fire alarm, special systems rough-in, and power distribution system.

General Contractor: Elder Construction

Architect: Hauser Architects

Engineer: AE Associates, Inc.

142408_00_N44_multipurpose-864x486.jpg

TRU Senior Care PACE Facility

A 22,000 square foot new construction included an 800 amp power distribution service with provisions for PV array system, LED lighting, lighting controls, power distribution, mechanical power connections, fire alarm system, and special systems rough-in.

General Contractor: Brinkman Construction

Architect: Boulder Associates

Engineer: Boulder Associates

Architect: Anderson Mason ale

Engineer: BCER Engineering

Contract Value: $1,750,180

VA-OUTPATIENT-CLINIC-PUEBLO-3-534x348.jpg

Pueblo Veterans Administration Clinic

Interior design-build of existing core and shell space with a small addition includes a replacement of an existing 120/208 volt service to a 277/480 volt service. Veterans Association tenant finishes included new site lighting, fire alarm, general purpose power, lighting, lighting controls, mechanical power, plumbing power, telecommunications, and security system.

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: Adonai Electrical Engineers, Inc.

OCR-MRI.jpg

Orthopaedic Center of the Rockies

A 13,580 square foot addition consisted of exam rooms, therapy treatment rooms, physical therapy gym, and casting/splinting rooms. The Remodel consisted of upgrading patient exam rooms, lobbies, patient recovery areas, therapy pool, patient therapy rooms, and operating rooms. Complete upgraded fire alarm system throughout the remodel. Complete Lighting Retrofit of existing fixtures throughout the remodel areas. Parking lot was upgraded to new LED lighting. All work was completed while the facility remained 100% operational throughout the construction project. Communication with the General Contractor, Doctors, Nurses, and other Staff members made this project a big success.

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: SRB Consulting Engineering, LLC

Redstone-Medical-Office-Building-Entrance-534x348-1.jpg

Redstone POB

A $1 million design-build Poudre Valley Health System project was completed with PVHS's Corporate Headquarters, Urology Center, Plastic Surgery PC, PVH Laboratory and Surgical Services, and Front Range Cancer Specialist. A new 1600 amp main distribution panel provided each of the six different tenants with separate metering for general purpose power, lighting, owner supplied equipment, and mechanical and plumbing systems.

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: SRB Consulting Engineering

Contract Value: $1,068,000

PoudreValleyHospitalMOB.jpg

Poudre Valley Hospital MOB

Location: Fort Collins, CO

General Contractor: Mortenson Construction

Architect: Albert Kahn Associates

Engineer: BCER Engineering

Contract Value: $1,100,000

Balfour.jpg

Balfour Senior Care

General Contractor: Saunders Construction

Architect: Lantz-Boggio

Engineer: Swanson Rink

Contract Value: $947,620

not-available.jpg

Cheyenne Surgery Center

The Cheyenne Surgery Center is a facility of 11,700 square feet consisting of three operating rooms and one shell space for a future fourth OR. Space for four pre-op beds, five post-op beds, three step-down beds and four private recovery rooms is included. Typical support spaces include clean and soiled workrooms, medical equipment storage, nurse station and men's and women's locker rooms were part of the scope.

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: Merit Electric

Contract Value: $174,279